Math, asked by neelamdevilahuwar, 11 months ago

A and B can do a piece of work in 12 days, B and C in 15 days, and C and A in 20 days. how much time will A alone take to finish the job?​

Answers

Answered by kaur6075o
0

Answer:

A alone takes10 days to finish the job

Attachments:
Answered by sharmahimanshu0633
0

Answer:

8.5

Step-by-step explanation:

A+B=12

B+C=15

C+A=20

A=12-B. (1)

B=15-C. (2)

C=20-A. (3)

FROM EQUATION 2

B=15-20+A.

B=-5+A. (4)

FROM EQUATION 1AND4

A=12+5-A

A+A=17

2A=17

A=17/2

A=8.5

Similar questions