Given
A and B will do a piece in 8 days
C will do work in 12 days
(A+B+C) one day work = 1/6
(A+B) one day work = 1/8
(B+C) one day work = 1/12
(A+C) one day work = (2× 1/6) -(1/8+1/12)
=> (1/3-5/24)
=> 3/24
=>1/8
A and C along can do the work in 8 days
===============