A, B together do a job in 6 days, B, C together do the same job in 10 days, C, A together do
the same job in 7.5 days. If all three work together in how many days will they complete
the job?
Answers
Answered by
0
Answer:
5 days
Step-by-step explanation:
A and B can do a job in 6 days. They complete 1/6th of the job in a day.
i.e.
1 /A + 1 /B = 1 /6 ------- -- (1)
Similarly, B and C will complete 1 /10 th of the job in a day.
i.e
1 /B + 1 /C = 1 /10 ---------- (2)
And C and A will complete 1 /7.5 or 2 /15 th of the job in a day
i.e
1 /C + 1 /A = 2 /15 ------------ (3).
Adding (1), (2) and (3) we get:
1/A+1/B+1/C= 1/5
i.e working together, A, B and C complete 1 /5 th of the job in a day.
Therefore, they will complete the job in 5 days.
Answered by
0
Answer:11.75days
Step-by-step explanation
A+B=6DAYS
B+C=10DAYS
C+A=7.5DAYS
2(A+B+C)=23.5DAYS
A+B+C=(23.5÷2)=11.75DAYS