A balls rolls down an inclined track 2 m long in 4 s. Find (1) Acceleration (2) Time taken to cover the second metre of the track and (3) Speed of the ball at the bottom of the track
Answers
Answer:
1) Acceleration = 0.25 m/s²
2) Time taken to cover the second metre of the track = 1.17 sec
3) speed of the ball at the bottom of track = 1m/s
Step-by-step Explanations :
Given : length of inclined track = 2m
Time taken = 4 sec
To find : 1) Acceleration,
2) Time taken to cover the second metre of the track and ,
3) Speed of the ball at the bottom of the track
Given values,
Length of inclined track (l) = 2m
Time taken to roll down the inclined (t) = 4 sec
Initial velocity (u) = 0
Using the equation of motion along the incline plane,
s = ut + 1/2 × at²
Substituting the given value in above formula we get,
2 = 0 + 1/2 × a × (4)²
2 = 1/2 × 16a
2 = 8a
a = 2/8 = 0.25 m/s²
Now, for the ball to cover 1 m distance along the incline plane,
s = ut + 1/2 × at²
Substituting the given value in above formula we get,
1 = 0 + 1/2 × (0.25)×(t1)²
∴ t1 = √8 sec
Now, for the ball to cover 2 m distance along the incline from the start ,
s = ut + 1/2 × at²
Substituting the given value in above formula we get,
2 = 0 + 1/2 × (0.25)×(t2)²
∴ t2 = 4 sec
The time taken to cover the second meter is T = t2 - t1
T = 4 - √8
= 1.17 sec
Using the first equation of motion,
v = u + at
Substituting the given value in above formula we get,
v = 0 + 0.25 × 4
v = 1 m/s