A can complete a certain work in 4 minutes, b in 5 minutes, c in 6 minutes, d in 10 minutes and E in 12 minutes. the average number of unites of work completeed by the them per minute will be
Answers
Answered by
0
Answer:
A can complete a certain work in 4 minutes, B in 5 minutes, C in 6 minutes, D in 10 minutes and E in 12 minutes. The average number of units of work completed by them per minute will be = ?
A. 0.16
B. 0.40
C. 0.80
D. None of these
Answer: Option A
Solution(By Examveda Team)
Required average,=14+15+16+110+1125=4860×15=425=0.16