Step-by-step explanation:
B can do work 60% fater than A = 12-.6x12 = 12-7.2 = 4.8
B can do work in 4.8 days
Answered by
2
A's 1 days' work = 1/12
∴ B's 1 days' work = 1.6/12= 16/120 = 2/15
∴ B shall complete the work in 15/2 days=