Math, asked by labhyajha, 2 months ago

A contractor got a contract for construction of three roads. The lenght of the first road is 130 km 750 m, the second road is 98 km 411 m and the thrid road is 203 km 42 m. Find the total length of the three roads that he needs to construct.​

Answers

Answered by adilakshmi49488
0

Answer:

the answer is 432km 202m

add all lengths

Similar questions