A four meter elastic band is increased 10%. find its new length.
Answers
Final answer: New length of an elastic band = 4.4
Given that: We are given length of a 4 elastic band is increased 10%.
To find: We have to find new length of an elastic band.
Explanation:
- Let "" be the initial value of any quantity. The value of quantity is increased or decreased by "%" of its initial value, then the increased or decreased value is given by,
Final value of the quantity = ±
The value of quantity is increased. Final value of the quantity
The value of quantity is decreased. Final value of the quantity
Here we apply this rule.
- The initial length of an elastic band = 4
- Length of an elastic band is increased by 10% of its initial length.
- So,
- Hence, new length of an elastic band = 4.4
To know more about the concept please go through the links
https://brainly.in/question/48151029
https://brainly.in/question/40914444
#SPJ3
The new length is 4.4 meters.
- A value or ratio that may be stated as a fraction of 100 is referred to as a percentage in mathematics. If we need to calculate a percentage of a number, we should divide it by its entirety and then multiply it by 100. The proportion therefore refers to a component per hundred. Per 100 is what the word percent means. The word "percent" is used to symbolise it. There is no dimension to percentages. As a result, it is known as a dimensionless number. When we say a number is 50% of anything, we mean that it is 50% of everything.
- We must divide the value by the entire value to find the percentage, and then multiply the resulting number by 100.
- The original number is subtracted from the new number, divided by the original number, then multiplied by 100 to get the % increase.
Here, according to the given information, we are given that,
A four meter elastic band is increased 10%.
When the elastic band is 100 meters, the band is increased to a length of 110 meters.
When the elastic band is 1 meter, the band is increased to a length of meters.
When the elastic band is 4 meters, the band is increased to a length of meters.
Hence, the new length is 4.4 meters.
Learn more here
brainly.in/question/27200323
#SPJ2