A four metre elastic band is increased by 10% find its new length
Answers
Answered by
13
four metre elastic band increased ,=10%
10%=4*10/100
10%=0.4
length=4+0.4
length=4.4m
10%=4*10/100
10%=0.4
length=4+0.4
length=4.4m
Answered by
23
Original Length = 4 m
% of length increased = 10%
Therefore Length increased = 10% of 4 m
= 10/100 x 4
= 1/10 x 4
= 4/10
= 0.4 m
Therefore , New Length = Original length + Increased Length
= 4 + 0.4
= 4.4m
Therefore New Length of the elastic band is 4.4 m
% of length increased = 10%
Therefore Length increased = 10% of 4 m
= 10/100 x 4
= 1/10 x 4
= 4/10
= 0.4 m
Therefore , New Length = Original length + Increased Length
= 4 + 0.4
= 4.4m
Therefore New Length of the elastic band is 4.4 m
Similar questions