Physics, asked by ms5kgtinani6kac, 1 year ago

A hydroelectric power station takes its water from a lake whose water level is 50 m above turbine . assuming an overall efficiency of 40%,calculate mass of water which must flow through turbine each second to produce power output of 1 mega watt

Answers

Answered by sawakkincsem
86
As we know that 
P=E/t
where p is power , t is time and e is the potential energy(mgh)
Now we know that g = 10 m/s
h= 50 m 
t=1 sec
Therefore,
mgh=P
m=P/gh
m= 400000/10 x 50
m=800 kg.
Similar questions