A man weighing 50 Kg carries a load of 10 Kg to
the top of the building in 4 minutes. The work done
by the man is 6 x 10^ J. If he carries the same load
in 8 minutes, the work done by the man will be-
(1) 1.5 x 104 J (2) 3 x 10'J
(3) 6 x 104 J
(4) 12 x 104J
Answers
Answered by
3
A man weighing 50 Kg carries a load of 10 Kg to
the top of the building in 4 minutes. The work done
by the man is 6 x 10^ J. If he carries the same load
in 8 minutes, the work done by the man will be-
(1) 1.5 x 104 J
(2) 3 x 10'J✔️✔️✔️
(3) 6 x 104 J
(4) 12 x 104J
Answered by
0
Answer:
Mgh=60×10×100
Mgh=60×10×100 6×10^4
Explanation:
It is same because work is not dependent On time
Similar questions