Physics, asked by shubham112240, 5 months ago

A resistance heating load is controlled from a single

phase supply using a TRIAC in the phase angle control

mode. Determine the firing delay when the power is at

(i) 70%, (ii) 60%, (iii) 20% of its maximum.​

Answers

Answered by spal1566
0

Answer:

70% single

phase supply using a TRIAC in the phase angle control

mode. Determine the firing delay when the power is at

(i) 70%, (ii) 60%, (iii) 20% of its maximum

Explanation:

(I)

Similar questions