A roller 150 cm long has a diameter of 70 cm. To level a playground it takes 750 complete revolutions. Determine the cost of leveling the playground at the rate of 75 paise per square. meter
Answers
= 750 × 2 × 22÷7 × 35 × 150
= 750 × 33000
= 24750000 cm^2
= 2475 m^2
Cost of leveling = 2475 × 0.75
= Rs 1856.25
The cost of leveling the playground at the rate of 75 paise per square meter is 1856.25 Rs.
Given: A roller
- 150 cm long has a
- Diameter 70 cm.
- To level a playground it takes 750 complete revolutions.
To find:
Determine the cost of leveling the playground at the rate of 75 paise per square meter.
Solution:
Concept used: 1 revolution of cylindrical roller is equal to curved surface area of roller.
Formula used:
where,
r: radius of cylinder
h: height/length of cylinder
Step 1: Find CSA of roller.
It is given that
Diameter: 70 cm
and 2r=d=70 cm
Length(h)=150 cm
Step 2: Find total area of ground.
Area of total ground can be calculated by multiplying CSA with number of revolution.
Area of ground
or
Area of ground
(As 1 meter²= 10000 cm²)
Step 3: Find cost of leveling.
As cost of leveling is 75 paise per m².
So,
Total cost
or
Total cost
(as 1 rupees= 100 paise)
Therefore,
The cost of leveling the playground at the rate of 75 paise per square meter is 1856.25 Rs.
Learn more:
1) the diameter of a road roller, 1m 40cm long is 80cm. if it takes 600 revolutions to level a playground, find the cost of...
https://brainly.in/question/49552
2) a water reservoir is 22 M long 16 m broad and 10 M height find the cost of cementing it's floor and the four wall at the...
https://brainly.in/question/7338974