A surface water treatment plant operates round the clock with a flow rate of 35 m3/min. The water temperature is 15c and jar testing indicated an alum dosage of 25 mg/l with flocculation at a gt value of 4104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is
Answers
Answered by
0
what is the answer of the question
Similar questions