A train 400m long is running at a speed of 40km/h.How long will it take to cross 800m long?
Answers
Answered by
32
Speed = 40 km/h
= 40 *5/18 m/s
Time required to cover 400m =( 400 * 18)/(40*5) = 36 sec
Time required to cover 800m = (36 * 400+800)/400
= 108 sec [Ans]
= 40 *5/18 m/s
Time required to cover 400m =( 400 * 18)/(40*5) = 36 sec
Time required to cover 800m = (36 * 400+800)/400
= 108 sec [Ans]
LeeChoiChan:
Man....
Answered by
0
Answer:
Step-by-step explanation:
.
Similar questions