Math, asked by Suhanacool5782, 7 months ago

A work force of 50 men with a contractor can finish a work in 5 months. In how many months the same work can be finish by 125 men

Answers

Answered by Anonymous
2

Answer:

Let the number of months required by men to finish a piece of work be ‘x’

  • months Men 50 125 Time (months) 5 x
  • We know k = xy
  • 50 × 5 = 125 × x
  • x = (50×5)/125 = 2
  • ∴ 125 men require 2 months to do a piece of work.