All project software systems do project scheduling using which procedure?
(A) Time-based procedure
(B) Task-based procedure
(C) Network-based procedure
(D) Priority-based procedure
Answers
Answered by
7
Answer:
proprity based procedure
Answered by
1
Explanation:
a answer is time based prod
9643903369k:
which one is correct u both gave different ans