An optimal job scheduling scheme
Answers
Answered by
2
The job scheduling problem in a partitionable mesh-connected system in which jobs require square meshes and the system is a square mesh whose size is a power of two is discussed. A heuristic algorithm of time complexity O(n(log n+log p)), in which n is the number of jobs to be scheduled and p is the size of the system is presented. The algorithm adopts the largest-job-first scheduling policy and uses a two-dimensional buddy system as the system partitioning scheme. It is shown that, in the worst case, the algorithm produces a schedule four times longer than an optimal schedule, and, on the average, schedules generated by the algorithm are twice as long as optimal schedules.