Atomic Power station in India methodology
Answers
Answered by
2
Answer:
I hope it would be helpful
Explanation:
The 63 GW expected by 2032 will be achieved by setting up 16 indigenous Pressurised Heavy Water Reactors (PHWR), of which ten is to be based on reprocessed uranium. Out of the 63 GW, about 40 GW will be generated through the imported Light Water Reactors (LWR), made possible after the NSG waiver.
If it helpful plz mark me as brainliest