Physics, asked by mouny36, 1 year ago

Calculate the work done by a force of 30N in lifting of 2kg to a height of 10m

Answers

Answered by afsanafatima5
4
Potential energy = mgh
=2×10×10=200J
Potential Energy=Workdone=200J

mouny36: Thq so much
afsanafatima5: No need dear
mouny36: Ok
Answered by Anonymous
2

Answer:

We know that,

Work (W) = Force (F) × Displacement (s)

Therefore,

W = 30 x 10 =300J

But, the force exerted by the Gravity, = Mg

Hence, negative work done my displacement = Mgh

= 2(-10)(10)

=-200

Therefore Work done = 300 + (-200)

  • =100J