Math, asked by Anjli5795, 11 months ago

Can do a piece of work in 10 days and b can do it in 15 days and c can do it 20 days. They started the work together and a leaves after 2 days and b leaves after 4 days from the beginning. How long will work last?



a.10 3/9 days



b.10 3/8 days



c.10 2/3 days



d.None of these 39

Answers

Answered by raj981
0

Answer:

c) 10 2/3

Step-by-step explanation:

it would be easier to solve by efficiency

days efficiency work

a = 10 6 60

b = 15 4 60

c = 20 3 60

they work together for 2 days

= 2(6+4+3)

after a left, b and c work for 2 days

= 2(4+3)

after b left, c did all work

=d(3)

therefore

2×13 + 2×7 + 3×d =60

26+14+3d=60

3d= 20

d=6 2/3

thus the remaining work was completed in 6 2/3 days by c

which makes the total = 4 + 6 2/3

=10 2/3

hope it helps you

please mark as brainliest

follow for content quality answers