TC = TFC + TVC
TC = TFC + TVCAverage Total Cost (ATC) is the total cost per unit of output. Average Fixed Cost (AFC) is the total fixed cost per unit of output. Average Variable Cost (AVC) is the total variable cost per unit of output.
❤✌#⃣❤✌#⃣✌