Business Studies, asked by Lakshay374, 1 year ago

During software life cycle which activity generally consumes the maximum effort

Answers

Answered by aqibkincsem
1

A life cycle model describes the entry and exit criteria that have been described well and includes testing with right phases.


It also consumes the maximum effort and most organizations usually define with standard results.


During feasibility work, it can study overall understand and involves right problem.

Answered by mindfulmaisel
2

During the ‘software life cycle’, the testing phase generally consumes the ‘maximum effort’.

Explanation:

  • The software designing methods have evolved over a period of time. The ‘software life cycle’ involves activities that are divided into various phases.  
  • The phases that include the feasibility, study, and testing is called the maintenance phase. The maintenance phase involves a lot of effort with the testing phase involving the ‘maximum effort’.  
  • The quality of output is checked after every phase. There certain methods that are involved in ‘software development methods’.

Learn more about software life cycle

Explain rapid application development in software life cycle

https://brainly.in/question/3172912

What is software life cycle

https://brainly.in/question/2021841