Math, asked by AxtroStar828, 4 months ago

Eddie watches a drawbridge rise at a constant rate. It takes 1 1/2 minutes for the drawbridge to rise to 1/3 of its total height. Eddie predicts that it will take a total of 4 1/6 minutes for the drawbridge to reach its full height. Is he correct? Explain why or why not.

Answers

Answered by itslovewar
0

Answer:

Eddie watches a drawbridge rise at a constant rate. It takes 1 1/2 minutes for the drawbridge to rise to 1/3 of its total height. Eddie predicts that it will take a total of 4 1/6 minutes for the drawbridge to reach its full height. Is he correct? Explain why or why not.

Similar questions