For a drug X the consumption in last 6 months was 720 strips, in which for 15 days
there was Stock Out. If the Procurement Period is 3 months and Average Lead time is
1 month then calculate the Quantity to order. The Inventory Stock is 200 Strips and
Safety stock is 100 Strips.
Answers
Answered by
5
Answer:
For a drug X the consumption in last 6 months was 720 strips, in which for 15 days
there was Stock Out. If Procurement Period is 3 months and Average Lead time is
1 month then calculate the Quantity to order. The Inventory Stock is 200 Strips and
Safety stock is 100 Strips.
Similar questions