The load test is performed on a single phase transformer, to find out its efficiency and regulation. In this method, a resistive load is connected to the transformer and it's loaded up to the rated current. This is direct loading method and can be applied to transformers with a rating less than 5kVA
Answered by
0
Answer:
The load test is performed on a single phase transformer, to find out its efficiency and regulation. In this method, a resistive load is connected to the transformer and it's loaded up to the rated current. This is direct loading method and can be applied to transformers with a rating less than 5kVA.