no proper safety equipment or alarms set up.
6th months worker training was shortened into a few weeks.
Answered by
3
Answer:
Union Carbide Corporation (UCC) argues water entered the tank through an act of sabotage. The owner of the factory, UCIL, was majority owned by UCC, with Indian Government-controlled banks and the Indian public holding a 49.1 percent stake.