How do the scientists and engineers prevent cost overruns?​

Answers

Answered by manzoorsaddah
2

Answer:

Normally to avoid time and costs overrun in construction processes a case by case analysis is to be made meaning: one bridge, one solution. In general terms, to save materials (cost), span by span in situ is the best approach. To save time precast segmental may be a good solution.

hope it was somehow helpful for u! :-)

Answered by hariuthiras
3

Answer:

Normally to avoid time and costs overrun in construction processes a case by case analysis is to be made meaning: one bridge, one solution. In general terms, to save materials (cost), span by span in situ is the best approach. To save time precast segmental may be a good solution.