How do the scientists and engineers prevent cost overruns?
Answers
Answered by
2
Answer:
Normally to avoid time and costs overrun in construction processes a case by case analysis is to be made meaning: one bridge, one solution. In general terms, to save materials (cost), span by span in situ is the best approach. To save time precast segmental may be a good solution.
hope it was somehow helpful for u! :-)♥
Answered by
3
Answer:
Normally to avoid time and costs overrun in construction processes a case by case analysis is to be made meaning: one bridge, one solution. In general terms, to save materials (cost), span by span in situ is the best approach. To save time precast segmental may be a good solution.