how many cubic meters of concrete is required to lay a path 125m long,60cm wide and 10 cm thick
Answers
Answered by
21
to find the cubic meters it is sufficient to find its volume
length=12500cm
width=60cm
height=10cm
volume = lbh
=12500×60×10
=75, 00, 000 cubic meters
length=12500cm
width=60cm
height=10cm
volume = lbh
=12500×60×10
=75, 00, 000 cubic meters
kaushika24:
hope that the answer is right
Answered by
15
7.5 cubic meters of concrete is required to lay a path.
Step-by-step explanation:
Volume of cuboid
It is given that a path 125m long, 60cm wide and 10 cm thick.
1 m = 100 cm
Length = 125 m
breadth = 60 cm = 0.6 m
Height = 10 cm = 0.1 m
Volume of path is
Therefore, 7.5 cubic meters of concrete is required to lay a path.
#Learn more
Find the volume of cuboid if surface area is 208 and ratio of length , breadth, height is 2, 3, 4.
https://brainly.in/question/8940291
Find the volume of cuboid if lenght is 12cm breadth is 10 and height is 8cm.
https://brainly.in/question/1858043
Similar questions
History,
8 months ago
Physics,
8 months ago
Math,
8 months ago
Social Sciences,
1 year ago
English,
1 year ago