how much time does cotton take to dry when soaked in 100ml water
Answers
Answered by
8
Answer:
Cotton shirts take 6 hours or more, with no forced cold air flowing through them. For induced heat and air exchange tumble drying in a machine: Several things matter: 1.
Explanation:
May this ANSWER will help you plz mark has brainliest
Answered by
0
Answer:
Cotton shirts take 6 hours or more, with no forced cold air flowing through them. For induced heat and air exchange tumble drying in a machine: Several things matter:
Explanation:
Similar questions