How much work is done at the rate of 40W in 40s
Answers
Answered by
54
power = workdone/time
40w = work/40sec
40X40 = work done
work done = 1600 J
................
@@ @@ @@ @@ @@
Please mark the answer as brain list answer
40w = work/40sec
40X40 = work done
work done = 1600 J
................
@@ @@ @@ @@ @@
Please mark the answer as brain list answer
Answered by
0
The amount of work done is 1.6 kJ
Given : At the rate of 40W in 40s
To find : The amount of work done.
Solution :
We can simply solve this numerical problem by using the following process. (our goal is to calculate the amount of work done)
Here, we have to use the following mathematical formula.
Work = Power × Time
In this case,
- Power = 40W
- Time = 40s
So, by putting the available data in the above mentioned mathematical formula, we get :
Work = 40 × 40 = 1600 J = (1600 ÷ 1000) kJ = 1.6 kJ
(As, 1 kJ = 1000 J)
Hence, the amount of work done is 1.6 kJ
Similar questions