Physics, asked by salonigamilcom7265, 1 year ago

How much work is done in moving a 500 uc charge between two point on an equipotential surface?

Answers

Answered by cwyt
15
it is zero.the work done in a equipotential surface is zero
Answered by shabihulhasanrizviah
0

On equipotential surface there is no work done to move charge from place to another.

Similar questions