Answered by dhyanapatel2010
0

Answer:

Find work done =W

Given,

Moving charge =2C=(Q)

Two points having a potential difference of  

=12V

h=QV

=2×12

=24J

Answered by TEJASWEE148
0

Answer:

==========================================

Work done = 24J

==========================================

Explanation:

==========================================

We have to take the potential difference as work done per unit charge to bring it from a point 0 to 12V.

The Potential difference, V=12V

Charge=2C

V=W/Q

12=W/Q

W=24J

Hence, the work done in moving a charge of 2c across the two points having a potential difference is 12V is 24J.

==========================================

Hope my answer helps...

Please mark it as the brianliest...