If 10 men, working 7 hours a day dig a trench 147 m long, how many men working 8 hours a day will dig a trench 168 m long (of the same breadth and depth as the first in the same number of days) ?
Answers
Answered by
2
Answer:
Working 7 hours a day 147 m long trench can be dug by = 10 men.
Working 1 hour a day 147 m long trench can be dug by = 10*7
Working 1 hour a day 1 m long trench can be dug by = (10*7)/147
Working 8 hours a day 1 m long trench can be dug by = (10*7)/(147*8)
Working 8 hours a day 160 m long trench can be dug by = (10*7*160)/(147*8)
= 11200/1176
= 9.523
As the men cannot be in decimal or fraction, so, the answer is 10 men.