If 3 men or 6 boys can do work in 20 days. 3 men or 8 boys shell takes?
Answers
Answered by
2
Answer:
The work can be completed in 20 days by 3 men or 6 boys.
Hence the capacity of 3 men = the capacity of 6 boys.
Hence if 4 men and 12 boys do the work together, than it is equivalent to,
4 + 6 = 10 men
Now the work quantum = 3 *20 = 60
Hence if now equivalent to 10 men are doing the work, then
No. of days = 60/10 = 6
Answered by
50
Answer:
3 men=6 bᴏys or
1 man=2boys.
3 men and 8 boys=(2×3+8) boys = 14 boys.
ɪꜰ 6 ʙᴏyꜱ ᴄᴀɴ ᴅᴏ ᴀ ᴊᴏʙ ɪɴ 20 ᴅᴀyꜱ ᴛʜᴇɴ
20 ʙᴏyꜱ ᴄᴀɴ ᴅᴏ ᴛʜɪꜱ ᴊᴏʙ ɪɴ
ʜᴇɴᴄᴇ, ᴀɴꜱᴡᴇʀ=6
Similar questions