If 3boys can finish a work in 9 days,how long will 9boys take to finish the same work?
Answers
Answered by
3
Answer:
it will take 3 days to complete the work.
Hope it helps you.
Thank you.
Answered by
1
Answer:
Since 3 men or 9 boys do the work in 21 days, 1 man is equivalent to 3 boys.
The work involved is 9*21 equivalent to 189 boy-days.
So 5 men and 6 boys is the same as 15+6 = 21 boys. So the time taken is 189 boy-days/21 boys = 9 days.