if it takes 42 minutes to load 3 1/2 trucks how many minutes will it take to load 6 1/2 trucks?
Answers
Answered by
2
Acc to ques, it takes 42 minutes to load 3 1/2 trucks.
That means 3.5 part of the truck can be loaded in 42 minutes.
1 part of the truck will be loaded in (42÷ 3.5) minutes.
Thus 6 of the truck will be loaded in 6.5 × (42÷ 3.5) minutes.
i.e. 273 / 3.5 = 78 minutes.
It will take 78 minutes to load 6 1/2 trucks.
Answered by
1
Solution :-
we know that it takes 42m to load 3 × 1/2 trucks
We want to find out how long it takes to load 6×1\ 2trucks
Thus 6× 1/2 of the truck will be loaded in
= 6.5 × (42÷ 3.5)
= 78 minutes.
==============
I hope it's help you.....!!!
we know that it takes 42m to load 3 × 1/2 trucks
We want to find out how long it takes to load 6×1\ 2trucks
Thus 6× 1/2 of the truck will be loaded in
= 6.5 × (42÷ 3.5)
= 78 minutes.
==============
I hope it's help you.....!!!
Similar questions