Math, asked by JasneelK6592, 1 year ago

if it takes 42 minutes to load 3 1/2 trucks how many minutes will it take to load 6 1/2 trucks?

Answers

Answered by imhkp4u
2

Acc to ques, it takes 42 minutes to load 3 1/2 trucks.

That means 3.5 part of the truck can be loaded in 42 minutes.

1 part of the truck will be loaded in (42÷ 3.5) minutes.

Thus 6 \frac{1}{2}  of the truck will be loaded in 6.5 × (42÷ 3.5) minutes.

i.e. 273 / 3.5 = 78 minutes.

It will take 78 minutes to load 6 1/2 trucks.

Answered by GauravSaxena01
1
Solution :-

we know that it takes 42m to load 3 × 1/2 trucks

We want to find out how long it takes to load 6×1\ 2trucks

Thus 6× 1/2 of the truck will be loaded in

= 6.5 × (42÷ 3.5)
= 78 minutes.

==============

I hope it's help you.....!!!

Similar questions