Is tetra ethile lead coming out from thermal power plants?
Answers
Answered by
2
The sector carries a weight of 10.3 while steel comes next at a mere 6.7. Also, thermal power generation accounts for about 65 percent of the total electricity generated in India.
Answered by
4
Answer:
- In the process for preparing tetraethyl lead involving a reaction between the metallic lead set free by the reaction of a sodium-lead alloy with ethyl chloride, a Grignard reagent and ethyl chloride, the improvement which consists in conducting the first stage reaction between the lead-sodium alloy and ethyl chloride ...