Business Studies, asked by siddeshkumarng, 2 months ago

ISRO is considering expansion of existing facility by adding 1 ton capacity of curing furnace for manufacturing solid propellant. Each batch on 1 ton propellant must undergo 30 minutes of furnace time, including loading and unloading operations. Due to power restrictions, the furnace is used only for 80% of the time. In a shift of 8 hours, the required output is to be 16 tonnes. If the plant system estimated is 40% of system capacity, determine the number of furnaces required.

Answers

Answered by JegadheeshT
0

Answer:

yuuwwuuwiiwehhie his I am

Similar questions