Business Studies, asked by kasireddydurgaprasad, 6 months ago

master production scheduling? problem on time study? ​

Answers

Answered by shivani5459
1

Answer:

.....mmmmmm thinking

Answered by rambachanprasad8858
1

Answer:

A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded.