master production scheduling? problem on time study?
Answers
Answered by
1
Answer:
.....mmmmmm thinking
Answered by
1
Answer:
A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc. It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded.
Similar questions