Mr. Anthony is the Configuration Manager for the ABC Utility. He has to plan Configuration Management. Planning CM has a set of sequential steps associated with it. Assume that you are part of CM Team and arrange the steps which are mentioned below in the sequential order while planning CM.
A. Levels of Control.
B. Selecting CIs
C. Determining categories of CM
D. Naming Conventions
E. Configuration Items(CIs)
Select one:
a. C,A,E,D,B
b. C,E,D,A,B
c. C,B,D,A,E
d. D,E,B,A,C
Answers
Answered by
38
Answer:
answer c ok note this answer
Answered by
6
Mr. Anthony is the ABC Utility's Configuration Manager. He must develop a plan for Configuration Management. Planning CM contains a series of steps that must be followed in order. If I assume I am a member of the CM Team, and while preparing CM, after arranging the actions listed below in the order we get - C, B, D, A, E(Option C).
- Configuration management, or CM, is a systems engineering technique that ensures a product's attributes remain consistent throughout its life cycle. Configuration management is an IT management technique that tracks individual configuration pieces of an IT system in the realm of technology. There is a total of 5 sequential steps for any configuration management - Plan, identify Ids, Control records, status accounting, and audit.
- So according to the rule, the serial here be, Determining categories of CM⇒Selecting Cls ⇒ Naming conventions⇒Levels of control⇒Configuuration Items(Cls).
- Hence, the correct option is, CBDAE.