Mr. Bhola, the tailor stitches 24 shirts ofthe same size from 54 m of cloth. Howmuch cloth is required for each shirt?
Answers
Answered by
1
Answer:
2.25 is the answer
Step-by-step explanation:
54/24=2.25
Answered by
1
Answer:
Mr bolna stitches 24 shirts
the total cloth required for stitching all the shirts is 54 m
then divide 54 metre of cloth in 24 shirts.
54/24=2.25 metre of cloth is required for making one shirt
Similar questions