National Flood Control Project was started in:
(a) 1952
(b) 1954
(c) 1956
(d) 1955
Answers
Answered by
0
1954
Image result for Nectar in a Sieve" was published in
Answered by
0
Answer:
Option b. 1954.
The National Flood Control Programme was launched in 1954. The measures to control flood mainly include the construction of flood embankments, drainage channels, raising villages and town protection works.
Similar questions
English,
2 months ago
Math,
2 months ago
Environmental Sciences,
4 months ago
Chemistry,
10 months ago
Math,
10 months ago
Social Sciences,
10 months ago