Chemistry, asked by Anonymous, 1 month ago

National Flood Control Project was started in:
(a) 1952
(b) 1954
(c) 1956
(d) 1955​

Answers

Answered by Anonymous
0

1954

Image result for Nectar in a Sieve" was published in

Answered by Anonymous
0

Answer:

 \huge \underline \red{★ Answer❀✿°᭄★}

Option b. 1954.

The National Flood Control Programme was launched in 1954. The measures to control flood mainly include the construction of flood embankments, drainage channels, raising villages and town protection works.

Similar questions