_________ once data has been entered it will be checked to see if it is correct.
Proofreading
Data verification
Double entry
2______ is the method of double-checking the data to see if it is correct.
Proofreading
Data verification
Double entry
3__________ existing system is stopped and replaced by a new system immediately
(1 Point)
Parallel running
Phased implementation
Direct changeover
4After the system is designed, it will be developed, then implemented.
Name two methods, other than direct changeover, that could be used to implement the
system.
5Name the two types of documentation that should be produced when creating a new system.
6Name the four techniques used while Analyzing the system.
7The system's life cycle is shown. The Design, Evaluation, Documentation, and Implementation
stages are missing.
Write these stages into their correct places.
________
Answers
Answered by
1
Answer:
please mark me brainliest and I will follow you
Similar questions