One man takes one day to dig a 4 m
long trench. How long would it take
2 men working at the same rate to
dig a 16m long trench?
B. 2 days
A. 1 day
C. 4 days
D. 8 days
Answers
Answered by
2
Given,
One man can dig a 4 metres long trench in one day.
To find,
The number of days that will be taken by 2 men to dig a 16 metres long trench.
Solution,
We can easily solve this mathematical problem by norrmal arithmetic method.
1 man can dig 4m trench in = 1 day
1 man can dig 1m trench in = 1/4 day
1 man can dig 16m trench in = 16/4 = 4 days
2 men can dig 16m trench in = 4/2 = 2 days
(Division and multiplication are done according to the direct or inverse proportion.)
Hence, it will take 2 days (option B).
Similar questions