One side of a square field is 200m. Find the cost of levelling it if the rate of levelling is rs0.30per square metre.
Answers
Answered by
16
one side of square is 200m so ready of field
= 200m×200m
=40000m^2
...
cost of leveling
=40000×0.30
=1200
hence 1200 rupees is needed for leveling
= 200m×200m
=40000m^2
...
cost of leveling
=40000×0.30
=1200
hence 1200 rupees is needed for leveling
Answered by
2
Answer:
240
Step-by-step explanation:
area of square =4×side
=4×200=800
rate of levelling =o.30×800=240