60/12 = 5 days will be the answer
helper1124:
a pe square h
Answered by
3
A can do pa job in 12 days
So, A's 1 day work = 1/12
In the same way,
B's 1 day work = 1/15
C's 1 day work =1/20
therefore,
A, B and C together do the job in 1/12+1/15+1/20=12/60
= 1/5
A, B and C together can do the job in 5 days
So, A's 1 day work = 1/12
In the same way,
B's 1 day work = 1/15
C's 1 day work =1/20
therefore,
A, B and C together do the job in 1/12+1/15+1/20=12/60
= 1/5
A, B and C together can do the job in 5 days