❥Q. Cost-effectiveness of CVD prevention. Determination of the overall risk of CVD.
SCORE risk diagrams. Risk levels. Risk based intervention strategies.
•subject = Epidemiology
• MBBS year 3rd.
Answers
Answer:
your carect answer__
Cost-effectiveness of a cardiovascular disease primary prevention programme in a primary health care setting. Results of the Polish part of the EUROACTION project
Abstract
Background: Well designed cardiovascular disease (CVD) prevention programmes appear to be generally applicable and effective in reducing exposure to risk factors and the incidence of disease. However, introducing them broadly into clinical practice would have a significant impact on the healthcare budget, and requires careful consideration.
Aim: The purpose of this health economic analysis was to assess the potential cost-effectiveness of the model nurse-led, comprehensive CVD primary prevention programme which was prepared and introduced in the EUROACTION project, in high-risk patients in Poland.
✓ In this research, we model cost-effectiveness of cardiovascular disease prevention with blood pressure and lipid drugs in Australia under three different scenarios: (1) the true current practice in Australia; (2) prevention as intended under the current guidelines; and (3) prevention according to proposed absolute risk levels.
✓ Once all risk factors have been identified, cardiovascular risk charts or calculator should be used to estimate the total risk of developing CVD over the following 10 years. A total CVD risk of over 20% over 10 years is defined as high-risk