Science, asked by appiahfrederick2810, 7 months ago

Selecting a basis of 70 tons/day production of juice from this plant in a continuous
production:
a. Conduct a process survey detailing all the information concerning each production
process. [15 marks]
b. İndicate all the waste characteristics and quantify the streams in pollution loads
using a 24 hour and a three (3) shift turn-over system. [10 marks]
c. Base on your estimations of the waste streams, conduct a waste survey for this
production line. [15 marks]
d. Using pollution base categorization of the EPA, classify the plant and give the
pollution profiles on which control methods will depend on. [10 marks]

Answers

Answered by RawatPahadi
0

Explanation:

this question is too long

Answered by arunac
1

Answer:

Dont know

Explanation:

Very sorry the first person who i cannot help

Similar questions