Math, asked by mishravidushi95, 12 days ago

sides of a triangular field are 5m, 7m and 8m. find the
cost of levelling the field at the sake of rupees10 þer m²?​

Answers

Answered by BrainlyArnab
1

Answer:

₹173. 2

Step-by-step explanation:

Given -

Sides of a triangular field = 5m, 7m and 8m

The rate of leveling the field = 10

To find -

The cost of leveling the field.

Solution -

To find the cost first we have to find out the area of field.

Area of Triangle =

 \sqrt{s(s - a)(s - b)(s - c)}

Here,

s = semi perimeter

a, b and c are three sides of triangle

We have sides now we have to find the semi-perimeter

s =  \frac{(a + b + c)}{2}  \\  =  \frac{(5 + 7 + 8)}{2} m \\  =  \frac{20}{2} m \\  = 10m

Now area

a =  \sqrt{s(s - a)(s - b)(s - c)}  \\  =  \sqrt{10 \times (10 - 5)(10 - 7)(10 - 8)}  \\  =  \sqrt{10 \times 5 \times 3 \times 2}  \\  =  \sqrt{5 \times 2 \times 5 \times 3 \times } 2 \\  =  \sqrt{5 \times 5 \times 2 \times 2 \times 3}  \\  =  \sqrt{ {5}^{2} \times  {2}^{2}  \times 3 }  \\  = 5 \times 2 \sqrt{3}  \\  = 10 \sqrt{3}  {m}^{2}

Hence the area = 103

= 10 × 1.732

= 17.32 (approx)

Cost of leveling 1 = 10

Cost of leveling 17.32 = 10 × 17.32

= 173.2

Cost of leveling the field = 173.2

Hope it helps.

Similar questions